Software for architects and design offices in Algeria (2027): work built from a superseded drawing, hours that exceed the fees, site snags lost among phone photos; phases, time spent, revisions, distribution, the site, and what we put in place

“I run an architecture practice. Last week the contractor poured a floor slab from a drawing we had changed twice since: nobody knows who the right version was sent to. The site snags are in my phone's photos, the site reports go out three days late, and I find out at the end of a job that we spent twice the hours planned. Is there management software for architects?” A practice sells hours and produces drawings: it has to know, at any moment, where the first stand and who received the second.

Symloop13 min read
Software for architects: who has which drawing revisionFees per phase, hours spent, drawing revisions, distribution, site snags, site reportsARCHITECTURE · DESIGN OFFICE · ALGERIA · 2027Software for architects:who has which drawing revisionFees per phase, hours spent, drawing revisions, distribution,site snags, site reportsREVISION Bat the contractor’sREVISION Dat the practicesymloop.com

Short answer. Software for an architecture practice or a design office holds four things that a spreadsheet and an inbox do not. Phases: for each job, a fee amount and a budget of hours per phase. Time: the hours entered each week, compared with that budget while the phase is under way. Drawings: every revision, and a register of who received what. The site: snags entered on the spot, per trade, followed until they are cleared. In this page's example, out of twenty drawing sends to track, six recipients do not have the latest revision.

This page is for those who run an architecture practice, a design office or a project supervision team, from three to fifty people, in Algeria or from France. The definitions come from public sources: architect, architectural drawing, document management system, timesheet, utilization rate, scope creep, change order, punch list, request for information. The practice, its drawings, its hours and its site are a constructed example. The page covers neither the rules on fees for design and supervision work, nor legal liabilities and guarantees, nor tax, and quotes no hardware price.

What is inside software for a practice

The figure stacks five layers; the third is the one that exposes the practice most.

Figure 1 · Five layers. The accented layer is documents: a practice produces drawings, and trouble starts when someone works from an old version.

The trade. An architect is a person who plans, designs, and oversees the construction of buildings. The software follows those three: the design, the drawings, the site. Jobs. Each contract is broken into phases, each with an amount and a budget of hours. Time. A timesheet is a method for recording the amount of a worker's time spent on each job; here, per job and per phase, once a week. The team's workload plan is covered in managing several projects.

Documents. That is the accented layer. A document management system is used to store, share, track and manage files; it keeps the history of the versions created and modified by each user. A tidy file server, described in file sharing, does part of that; it does not say who received which version. The site and fees each have their section. The client. They can follow their file, their drawings and their fee invoices in a client area; a developer also has buyers, see selling off-plan. The contractor opposite. Its own tracking, quotes, progress claims, margin per site, belongs to construction company software.

01

A job, phase by phase

The figure gives, for five phases taken as an example, what is handed over and what is measured.

Figure 2 · Five phases, as an example: names and breakdown follow each contract. For each, one thing handed over and one thing measured; it is the second that says whether the phase earned what it cost.

Phases, not a lump sum. The breakdown and the names come from your contract; those in the figure are an example. What matters: each phase has a fee amount and a budget of hours. The utilization rate. It is an important number for firms that charge their time to clients: billable hours divided by the hours recorded in the period. A team that spends half its week on jobs with no open phase is working, but not billing. A worked example, fictitious: a phase sold for 900,000 dinars with a budget of 300 hours. At 240 hours, the file is half done: the phase will end around 480 hours, that is 160% of the budget. Seeing it at 240 hours leaves a choice; seeing it at 480 leaves only the finding.

Creep. Scope creep is continuous or uncontrolled growth in a project's scope, generally experienced after the project begins. In a practice it has a face: the change requested “while you are at it”. The variation. A change order is work that is added to or deleted from the original scope of work of a contract. The software does not decide whether it should be invoiced; it counts the hours spent on each request, so that the discussion takes place with a figure. Fee invoices. A phase marked complete proposes its invoice; the amount still to invoice and payments received are read per job, and late ones are chased as in customer credit.

02

Who has which revision of which drawing

The figure shows a distribution register: six drawings, four recipients.

Figure 3 · A distribution register: six drawings, four recipients, twenty sends to track, six behind. Two drawings are being built by the structural contractor from an old revision. Constructed example.

What a drawing is for. Architectural drawings are used to communicate ideas, to assist the building contractor in construction based on design intent, and to record the design. All three uses assume that everyone is looking at the same version. The revision. Each change to a drawing gives it a new revision, A, B, C; the old one is not deleted, it is superseded. The register. In the example, six drawings and four recipients make twenty sends to track. Six are at least one revision behind. Two are serious: the structural contractor has the ground floor plan at revision B when the practice is at D, and the formwork drawing at revision C when it is at E.

What the software does. At each new revision, it lists the recipients of the old one and prepares the send: a transmittal, the files, a link whose opening is recorded. The superseded drawing carries a visible mention, “superseded by revision D”. A QR code on the drawing. Printed in the title block, where the person who drew the drawing and the person who approved it already appear, it lets anyone on site check on a phone whether the sheet in their hands is the latest. Questions. A request for information is used in the construction industry when a project's construction documentation lacks information; each question from the contractor is tied to the drawing concerned, with its answer and its date.

«The up-to-date drawing exists; the question is who received it.»
03

A site visit

The figure follows a site visit in six steps.

Figure 4 · Six steps. The accented step is entry on site: a snag noted on the phone in front of the work, with its photo, does not have to be written up at the office that evening.

The snag list. A punch list or snag list is a document prepared during key milestones or near the end of a construction project, on which what still has to be put right is noted; it can also be kept rolling, by constantly verifying the work status throughout the project. It is that second way that the software makes practicable. On site. That is the accented step: in front of the work, a photo, the place, the trade, a due date. The photo is timestamped and kept as in photos that stand as proof. Without a network. A basement or a remote site has no connection: entry carries on and synchronises afterwards, see the offline application.

The site report. It is generated on leaving: those present, points discussed, new snags, cleared snags, decisions. It is not retyped. Sending. Each contractor receives what concerns it: its list, its due dates, its photos. Clearance. The contractor declares the snag cleared, with a photo; it is only closed after a check at the next visit. What that changes. The report goes out the same day instead of three days later, and the next visit starts from the list of what was due to be done.

04

Snags, by trade and by age

The figure gives the state of the snags after ten visits.

Figure 5 · After ten visits: 86 snags raised, 61 cleared, 25 open of which 9 for more than thirty days. By trade, with their age. Constructed example.

Three figures. 86 snags raised, 61 cleared and checked, 25 open. The first says the site is being followed; the third says what is left. Age. Of the 25, 9 have been open for more than thirty days: they are the ones that count. A recent snag is normal; an old snag is a disagreement, an oversight, or one trade waiting on another. By trade. Structure 7 of which 3 old, electrical 6 of which 2, plumbing 5 of which 2, joinery 4, painting 3.

What is done with it. The site meeting opens on the old snags, trade by trade; everyone leaves with their list and a date. What is measured. Open snags per trade; average time to clearance; snags reopened after a refused clearance; snags with no due date. Several sites. The same figures, side by side: you see which one is drifting before the client says so. Who keeps the list. It is usually made by the owner, the architect or designer, or the general contractor; the software lets all of them look at the same one.

«A recent snag is normal; an old snag is a disagreement, an oversight, or one trade waiting on another.»
05

Nine weeks for a practice

Nine weeks in the example, for one practice.

  • What you receive: jobs with their phases, fees and budgets of hours; weekly time entry; drawings with their revisions and the distribution register; snags entered on the phone, per trade; generated site reports; fee invoices and the amount still to invoice.
  • What the practice avoids: work built from a superseded drawing, the phase that cost double without anyone seeing it, the snag lost in a photo gallery, the site report sent three days after the visit, the forgotten fee invoice.
  • What is measured: hours spent against budget, per phase; the team's utilization rate; drawing sends that are one revision behind; open snags per trade and by age; time to clearance; amount still to invoice per job.
  • What Symloop does: scoping the phases and the numbering, jobs and time, documents and distribution, the site application, site reports, fees, the client's area, for one practice or several offices.
Figure 6 · Nine weeks in the example. The accented period is the first: drawing numbering and phases are fixed before anything else, because everything else hangs on them. Indicative durations of a constructed example.

Scoping. One week: your phases, your drawing numbering, your usual recipients, the jobs in progress. Numbering. A drawing is always named the same way: job, discipline, number, revision. That is the practice's decision, not the software's; it is taken once. Taking over. Jobs in progress come in with their phases, the fees already invoiced and their latest revisions; older history stays where it is.

With your drawing tools. The software replaces neither the drawing software nor the building model: it files what they produce, gives it a revision and follows its distribution. Ready-made or custom. Management software for practices exists and covers time and fees well. Custom work is justified when the distribution register, snags entered on site and the client's area have to live in the same tool, in Arabic and in French. The durations are those of a constructed example.

What management software for an architect?
Software that follows jobs per phase, with fees and hours, drawings with their revisions and distribution, and the site with its snags and reports. A drawing tool does none of that.
What software for a design office?
The same base: jobs, phases, time spent, revisioned documents, distribution. A design office often adds more disciplines per job, and more drawings to keep consistent between them.
How do you track hours spent on an architecture project?
With weekly entry, per job and per phase, compared with the phase's budget of hours while it is under way, not at the end of the job.
How do you manage drawing versions?
Each change creates a new revision; the old one is marked superseded, never deleted. The software keeps the history and always shows which revision is current.
How do you know who received which version of a drawing?
With a distribution register: each send records the drawing, the revision, the recipient, the date and the opening. At each new revision, the list of those who hold the old one is shown.
How do you track site snags?
By entering them on the spot with a photo, a place, a trade and a due date, then following them one by one until clearance is checked, with their age.
How do you produce a site report quickly?
By generating it from what was entered during the visit: those present, new and cleared snags, decisions. It goes out the same day, and each contractor receives its part.
Does the software replace the drawing software?
No. It files what the drawing software produces, assigns it a revision and follows its distribution. The two work side by side.
Does it work on site without a connection?
Entry of snags and photos has to carry on without a network and synchronise when the connection returns. It is a construction choice to make from the start.
Can the client follow their project?
Yes, in an area reserved for them: progress per phase, drawings at the current revision, site reports and fee invoices, without seeing the rest of the practice.
Tell us how many people, how many jobs in progress, and how your drawings are named today: we start with a week of scoping

A superseded drawing on site, hours that exceed the fees, snags in the phone, site reports running late, or a practice you want to run from France

Symloop builds the tool that holds your jobs, your drawings and your sites together: phases and time, revisions and distribution, snags and site reports, fees. Describe your phases to us, your usual recipients and what you already track.